Skip to main content
Loading…
This section is included in your selections.

Unless judged by the ODEQ and the City to be exempt or granted a waiver, the following performance criteria shall be addressed for stormwater management at all sites:

A. All site designs shall establish stormwater management practices to control the peak flow rates of stormwater discharge associated with specified design storms and reduce the generation of stormwater. These practices should seek to utilize pervious areas for stormwater treatment and to infiltrate stormwater runoff from driveways, sidewalks, rooftops, parking lots, and landscaped areas to the maximum extent practical to provide treatment for both water quality and quantity.

B. All stormwater runoff generated from new development shall not discharge untreated stormwater directly into a jurisdictional wetland or local water body without adequate treatment. Where such discharges are proposed, the impact of the proposal on wetland functional values shall be assessed using a method acceptable to the ODEQ and the City. In no case shall the impact on functional values be any less than allowed by the Army Corp of Engineers (ACE) or ODEQ responsible for natural resources.

C. Annual groundwater recharge rates shall be maintained, by promoting infiltration through the use of structural and non-structural methods. At a minimum, annual recharge from the post development site shall mimic the annual recharge from pre-development site conditions.

D. For new development, structural stormwater treatment practices shall be designed to remove 70% of the average annual post development total suspended solids from 90% of the annual runoff.(TSS). It is presumed that a STP complies with this performance standard if it is:

osized to capture the prescribed water quality volume (WQv).

odesigned according to the specific performance criteria outlined in the local stormwater design manual,

oconstructed properly, and

omaintained regularly.

E. Stormwater discharges to critical areas with sensitive resources (i.e., cold water fisheries, shellfish beds, swimming beaches, recharge areas, water supply reservoirs) may be subject to additional performance criteria, or may need to utilize or restrict certain stormwater management practices.

F. Certain industrial sites are required to prepare and implement a stormwater pollution prevention plan, and shall file a notice of intent (NOI) under the provisions of the National Pollutant Discharge Elimination System (NPDES) general permit. The stormwater pollution prevention plan requirement applies to both existing and new industrial sites.

G. Stormwater discharges from land uses or activities with higher potential pollutant loadings, known as "hotspots", may require the use of specific structural STPs and pollution prevention practices.

H. Prior to design, applicants are required to consult with the ODEQ and the City to determine if they are subject to additional stormwater design requirements.

I. The calculations for determining peak flows as found in the Stormwater Design Manual shall be used for sizing all stormwater management practices.