Skip to main content
Loading…
This section is included in your selections.

A. Each industrial user shall provide and operate at the industrial user’s own expense a monitoring facility to allow inspection, sampling, and flow measurement of each pipe or conduit which discharges to the sanitary sewerage system. Each monitoring facility shall be situated on the industrial user’s premises. When such a location would be impractical or cause undue hardship on the industrial user, the City Manager may allow the facility to be constructed in the public right-of-way if the facility is located so that it will not be obstructed by landscaping or parked vehicles. The industrial user shall pay all costs associated with such an alternate location.

B. There shall be ample room in or near the sampling facility to allow accurate sampling and preparation of samples for analysis. The sampling facility and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the industrial user.

C. All monitoring facilities shall be constructed and maintained in accordance with all applicable local construction standards and specifications. Construction shall be completed no later than one hundred twenty (120) days of the industrial user being notified by the City Manager. (Ord. 2-2023 § 1 (Att. A), 2023.)