Skip to main content
Loading…
This section is included in your selections.

A. Utility Lines: Easements for sewers, water mains, electric lines or other public utilities shall be dedicated wherever necessary. The easements shall be at least 12 feet wide and centered on lot or parcel lines, except for utility pole tieback easements which may be reduced to six feet in width.

B. Water Courses: If a tract is traversed by a water course such as a drainage way, channel or stream, there shall be provided a storm water easement or drainage right-of-way conforming substantially with the lines of the water course, and such further width as will be adequate for the purpose. Streets or parkways parallel to the major water courses may be required.

C. Pedestrian and Bicycle Ways: In compliance with the Transportation Plan, a pedestrian or bicycle way may be required to connect to a cul-de-sac or to pass through an unusually long or oddly shaped block or otherwise provide appropriate circulation, as per Section 460.100 E. and F. Bicycle lanes on County streets shall comply with County bicycle lane standards.